Challenge
Pipe Works Services received a call from a frequent customer in Summit, NJ with excessive water build-up in the basement of a dentist's office.
Solution
Pipe Works Services technicians Pedro, Washington, and Malik removed the existing metal sewer ejector pit and got the pit pumped out. Pipe Works Services then installed a new Liberty PVC sewer ejector pit with a sealed cover. They connected the drainage branches back into the pit and seal it properly. This includes a new cast iron Liberty Sewer Ejector Pump with a 3-year manufacturer warranty with an alarm. The technicians cemented the area that was opened up. Pumps and alarms will be tested and back in use by the end of the day.